Te Ara Awataha Greenway

Adapt Construction was engaged by main contractor, Piritahi to execute the boardwalk sections as part of the new Kāinga Ora development in Northcote.

Introduction

Adapt Construction was tasked by Piritahi, a prominent main contractor, to undertake the construction of boardwalk sections within the new Kāinga Ora development in Northcote. This case study delves into the challenges faced by Adapt Construction during this project, their strategies for overcoming these hurdles, and the successful outcome achieved.

Client and Project Overview


  • Client: Piritahi

  • Project: Construction of boardwalk sections in the Kāinga Ora development in Northcote

Challenges Faced


  1. Terrain and Access Limitations: The undulating terrain posed significant challenges for construction activities, making access difficult and requiring specialised equipment.

  2. Adverse Weather Conditions: Unfavourable weather conditions added complexity to the construction process, potentially causing delays and affecting the quality of work.

  3. Stringent Health and Safety Standards: Ensuring exceptional health and safety standards amidst challenging working conditions required meticulous planning and execution.

  4. Strict Deadline: With a looming deadline, there was immense pressure to complete the project on time without compromising quality.

Approach and Solutions


  1. Specialised Equipment and Techniques: Adapt Construction utilised specialised drilling equipment and innovative construction techniques to navigate the challenging terrain effectively.

  2. Weather Monitoring and Adaptation: Constant monitoring of weather forecasts allowed the team to plan construction activities accordingly, minimising the impact of adverse weather conditions.

  3. Comprehensive Safety Protocols: Robust safety protocols and regular safety audits were implemented to ensure the well-being of the construction team throughout the project duration.

  4. Efficient Project Management: Strategic scheduling and resource allocation enabled the team to optimize productivity and meet the strict project deadline without sacrificing quality.

Outcome and Achievements


  1. Timely Completion: Despite the challenges encountered, Adapt Construction successfully completed the project within the stipulated timeframe, meeting the client's expectations.

  2. High-Quality Deliverables: The boardwalk sections constructed by Adapt Construction met high-quality standards, contributing to the overall aesthetic and functionality of the Kāinga Ora development.

  3. Exceptional Health and Safety Record: Through proactive safety measures and adherence to stringent protocols, Adapt Construction maintained an exemplary health and safety record throughout the project.

  4. Client Satisfaction: Piritahi and other stakeholders expressed satisfaction with the outcome of the project, acknowledging Adapt Construction's dedication and professionalism in overcoming challenges and delivering results.

Conclusion

Adapt Construction's successful completion of the boardwalk sections in the Kāinga Ora development exemplifies their ability to overcome challenges with resilience, innovation, and commitment to excellence. By effectively navigating terrain obstacles, managing adverse weather conditions, and prioritising health and safety, Adapt Construction not only met but exceeded client expectations, leaving a lasting positive impact on the project and stakeholders involved.