Northcote Bollards
Adapt was contracted by Piritahi to carry out bollard installations for the Northcote Kāinga Ora project.
Project Overview
Adapt was contracted to execute a comprehensive installation of 120 bollards to enhance the perimeter of the newly developed sports park situated on Lake Road.
Scope of work
Breaking out existing concrete
Identified and removed existing concrete obstacles to facilitate the installation of bollards.
Employed industry-standard methods to minimize disruption and ensure safety during the demolition process.
Digging out the trench
Executed precise excavation to create trenches for the installation of bollards.
Adhered to project specifications and guidelines to achieve optimal depth and alignment for the trenches.
Filling punch pads
Utilised suitable materials to fill punch pads, ensuring a stable foundation for the bollards.
Applied industry best practices to guarantee durability and longevity of the installed punch pads.
Installing bollards
Methodically positioned and secured 120 bollards in accordance with project plans and specifications.
Implemented rigorous quality control measures to guarantee the integrity and uniformity of the bollard installations.
Pouring the mowing strip
Poured and finished the mowing strip to complement the bollard installation and enhance the overall aesthetic of the sports park.
Applied finishing techniques to achieve a smooth and visually appealing surface for the mowing strip.
Challenges and solutions
Identified and addressed potential challenges such as soil conditions, existing infrastructure, and weather constraints to ensure the successful completion of the project.
Employed adaptive strategies and collaborated with relevant stakeholders to overcome unforeseen obstacles.
Results
The completion of the bollard installation project at Lake Road Sports Park has significantly enhanced the safety and aesthetics of the park's perimeter.
Client
Piritahi
Location
Lake Road / Greenslade Road, Northcote
Date